Skip to main content

Date Field: add and format dates and times

Add a Date field, pick Compact, Standard or Long display, add a time, and use it in Calendar and Timeline views.

Written by Emma Montgomery

A Date field holds a calendar date, with a time if you add one. Think of a date written on a contract's cover sheet.

Here is the test: is the answer a single point on the calendar? If yes, you want a Date field. For a start and an end, use a Date Range field. For a deadline that tracks completion, use a Due Date field.

Example: a Contracts table with a field called Contract Renewal Date. Each contract shows the date it renews, so Procurement can see the renewals coming up in Calendar View.

The Contract Renewal Date field in a contract record, showing a date in the Standard format.

The Contract Renewal Date field in a contract record, showing a date in the Standard format.

Plan Availability

All plan types.

Permissions

Solution Managers and Workspace Administrators can create, modify and manage Date fields.

Platform

Web

Related Reading


Adding a Date Field Type

  1. In Grid View, select the + at the right end of the column headers. From an open record, select + Add new field to this Table at the bottom instead.

  2. Select Date. You can type to search the list of field types.

  3. Name the field. In this article it is Contract Renewal Date. A field name can hold up to 50 characters, and there is no restriction on the characters it can contain.

The field settings panel opens. It has four tabs: Settings, AI Field Agent, Defaults and Help Text. The rest of this article takes them in that order. Save at any point with Add Field (or Update Field on a field that already exists) and come back to the other tabs later.

The field settings panel, Settings tab, with the Display Format preview and Options.

The field settings panel, Settings tab, with the Display Format preview and Options.


Settings

The Settings tab holds how the date looks and one rule. Top to bottom: Display Format and Options.

Display Format

How the date looks in a record and in views. The preview box shows the current moment in the chosen format. Open it to see the three options, each with a live sample.

  • Compact: 10/29/2026 at 7:22 PM.

  • Standard (the default): Oct 29 at 7:22 PM.

  • Long: Thu, Oct 29 at 7:22 PM.

Standard and Long leave out the year for dates in the current year. The samples show a time because the preview uses the current time; a value without a time shows the date only. Whichever format you pick, each member sees dates in the order their own locale uses.

Tip: Use Compact where the year must always be visible, such as a list of renewal dates that runs years ahead. Standard reads best in a record.

The Display Format dropdown open, showing Compact, Standard and Long with their samples.

The Display Format dropdown open, showing Compact, Standard and Long with their samples.

Options

Require an entry in this field. Off to start. On, a Required label shows next to the field, and a record cannot be saved until a date is entered. The message reads "Date is required". Turn it on when a blank means something is missing. For Contract Renewal Date it is on: a contract with no renewal date is a contract nobody is watching.


AI Field Agent

Off by default. The field works fully without it. Turn it on to let SmartSuite AI fill the date from instructions you write.

  • Connection: the AI credential the field uses. The field cannot be saved with the agent on until one is chosen.

  • Instructions: what you want the agent to do, in plain words, with at least one field from the record inserted as a variable.

  • Run Automatically: on, the agent runs each time the record is updated; off, it runs when you ask.

Example for Contract Renewal Date, with the Contract Document field inserted as a chip (shown here in bold): "Read Contract Document and find the renewal or expiry date. Set this field to that date. If the document names no date, leave the field empty." A person still reviews what the agent set. The AI Field Agent article covers connections and instructions in full.

The AI Field Agent tab turned on, with a connection, the instruction for Contract Renewal Date showing the Contract Document chip, and Run Automatically.

The AI Field Agent tab turned on, with a connection, the instruction for Contract Renewal Date showing the Contract Document chip, and Run Automatically.


Defaults

Default Date is the date every new record starts with. It is set to No Default Date to begin with. The other options are Today, Today Plus and Specific Date.

  • Today: the date the record is created.

  • Today Plus: a number of days after the record is created. Pick it and a Days box appears, set to 1. The number can be 1 to 999.

  • Specific Date: one fixed date for every new record.

Note: Defaults apply to new records only. Records that already exist do not change when you set or change a default.

Contract Renewal Date has no default, because each contract's date comes from the contract. A field such as Next Review Date might use Today Plus 365.


Help Text

A note for the person filling in the record, up to 800 characters. Help Text Appearance shows it As A Tooltip (the default, behind an info icon next to the field name) or Below The Field Name (always visible).

Write it for someone who has never seen the field. For Contract Renewal Date: "The date the contract renews or expires. Take it from the term clause, not the signature date."


Permissions

Field Permissions. Every field can carry its own permissions, which control who can see the field and who can edit it. Open the column menu and select Edit Field Permissions. Let Procurement set Contract Renewal Date while everyone else reads it. See Field Permissions.

Dynamic Record Permissions. A Date field can also drive record-level rules: who can see or edit a record based on the value it holds. Every field type except Button can drive a rule. See Dynamic Record Permissions.


Using the field in views and records

Once dates are entered, the field answers "when?" across the table.

In a grid cell, double-click (or select the chevron) to open the editor. Type the date in the box or pick a day in the calendar, then select Done. To add a time, select + Time and pick from the list in 15-minute steps, or type one. The x next to the time removes it. In a record, the field is a plain box that opens the same picker.

Note: The time belongs to each value, not to the field. One contract can have a time and the next none.

The date picker open on a grid cell, with a day selected, the + Time list showing 15-minute steps and the Done button.

The date picker open on a grid cell, with a day selected, the + Time list showing 15-minute steps and the Done button.

Calendar View places each contract on its renewal date; pick the field under By in the toolbar, and add another date field with + Add another field. Timeline View reads Date, Due Date and Date Range fields; under By, pick the start field and, for a span, an end field. See Calendar View and Timeline View.

Filtering

The operators are is, is not, is before, is after, is on or before, is on or after, is empty and is not empty. The value can be Today, Tomorrow, Yesterday or an exact date or range. It can also be the previous, current or next week, month, quarter or year, or the next or past number of days. "Contract Renewal Date is within the next 90 days" lists the renewals to start on now. Spotlight uses the same operators, and Find searches the dates.

Grouping

Group a view by the field and each day becomes a group. The time is ignored, so two renewals on the same day sit together.

Sorting

Sort 1 → 9 or 9 → 1 from the column menu. 1 → 9 puts empty values first, then the oldest date to the newest.

Counting and rolling up

A Rollup field on Vendors can show the earliest Contract Renewal Date across a vendor's contracts. The field also works in Lookup fields, in the filters of Lookup, Count and Rollup fields, and in Auto-Generated Titles. In Grid View, the column footer can show Earliest Date, Latest Date and Date Range.

Formulas

A formula reads the field as a date. YEAR([Contract Renewal Date]) gives the year. This one gives the date to start the renewal review:

DATEADD([Contract Renewal Date], -90, "days")

Formula Functions & Operators lists the date functions.

Automations

A Date field can start a date-based automation, such as a reminder ahead of Contract Renewal Date. See Automations: date-based triggers for the trigger and its settings.

Forms

A Date field can be placed on a form. The form builder can turn on Include time, so the respondent adds a time with the date. See Form View.


Editing a Date field

Change a date in one record. Double-click the cell, pick or type the new date, and select Done.

Remove a time. Open the picker and select the x next to the time. The date stays.

Change the display format. Open the column menu (⋮), select Modify Field Settings, pick another format under Display Format, then Update Field. Every record shows the new format; the stored dates do not change.

Change the field type. A Date field can become a Text, Text Area, SmartDoc or Due Date field. See Changing a Field's Type.

Note: Changing to Due Date needs a Status field in the table, because every Due Date field is linked to one. Changing to Text keeps the dates as plain text.


Frequently asked questions

How do I stop the field from showing a time?

The time is set for each value. Open the date picker and select the x next to the time to remove it.

Why does my date show in US (or UK) format?

Date and time formats follow the locale in each member's profile. The stored value is the same for everyone.

How do I set a time zone for the field?

There is no per-field setting. Times follow each member's locale and time settings.

How do I get records on my calendar in time order?

Add a time to each date with + Time. Calendar View places the record on its date, and Day view orders records by time.

Do I need a start date for Timeline View?

Timeline View reads Date, Due Date and Date Range fields. To show a span rather than a point, use a Date Range field, a Due Date with a start date, or add an end date field under By.

Date or Due Date?

Use Date for a plain date, such as a renewal or a signing. Use Due Date when the work has a status that completes it and you want overdue counts.

Need more help? Ask the SmartSuite Community, where builders, administrators and the SmartSuite team answer questions about building on SmartSuite. For your account, billing or data, select the chat button in the lower-right corner of SmartSuite to reach support.

Last verified 1 Nov 2026.

Did this answer your question?